Sports Councilman informed of all actions that have been developed at the Municipal Sports de la Hoya, with which has improved among other things, access to the pool in summer or channeling the promenade in draining the precipitation.
As explained by the councilor of the area of ​​Sports and Services, within the memory of actions planned for 2014, various improvement works in the sports facilities of sports, which will be concluded during the year were collected.
At the moment, within the completed works, is nearby access to the pool, with paved enclosure, and the remodeling of the green zone, in which banks have relocated and have been built for vegetation alcorques four .
As he explained, "this reorganization was important, because with it we managed to give life to the track, preventing accumulation of dirt while improving arenas runoff during rain seeping into the track, hindered use thereof. "
Moreover, in the small artificial turf track, has enabled a direct door access to the site, with which allows direct access to the runway preventing the flow field by Francisco Ibáñez.
It has also built a work bench for users of the same.
On the track, it has remained a green nursery next to which various apparatus for performing physical and technical specific exercise will be installed.
Work will continue with the refurbishment of public toilets is those who act on the tiling and health will be improved.
Also as important action is envisaged that the entry of the Avenida de la Libertad, where metal ladders are replaced by a wide ramp, with access to facilities shall be conditioned favor, leaving this entry as door Home to Sports.
Source: Ayuntamiento de Jumilla