The works required for remodeling Echegaray Street, have already been completed, so that vehicles normally recirculate this way the municipality, after eliminating bumpy and undulating problems presented by the firm.
In 2010 took place in the plan of action in the streets and public spaces, the redevelopment of the street where the sewer service, water, asphalt and sidewalk repair was reformed.
But gradually, the street came anomalies presented asphalt pavement, with ripples that hindered the movement of vehicles.
After numerous complaints the City of Jumilla to the contractor of the works, the company began remodeling the street, in order to correct the anomalies in the stretch of Avenida de Yecla to Calle de la Paz .
The actions have focused on the search of the street pavement and replacement of asphalt, which is already in perfect condition, as confirmed from the Department of Works and Planning of the City of Jumilla.
Source: Ayuntamiento de Jumilla