Portal de Jumilla

www.portaldejumilla.com

Jumilla - SpanishJumilla - English
detail of Jumilla

 

San Francisco Pavilion pavement repair works begin (12/09/2017)

Last Friday began the repair works of the pavement of the Pavilion of the College San Francisco.

Once exhausted the deadlines of requirements to the construction company is the City council of Jumilla that takes care of subsidiary form of the works necessary to be able to reopen it to the public.

The pavement had long been generalized air pockets due to poor placement and adhesion of the PVC sheet, which made its use dangerous, so the installation was closed. The works are being carried out by Urbansport Equipamientos SL and will have a cost of 49,284.51 euros.

They will be carried out in two phases.

In a first, the PVC sheets are being ginned and the concrete zone will be regularized.

It will then be allowed to dry for about two months to replace the sheet.

Source: Ayuntamiento de Jumilla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información