Work is already under way on the rehabilitation of the courtyard and the main entrance of the City of Jumilla.
The leaks of the roof of the monumental balcony of the patio have been repaired and the sanding and repainting of the patio is proceeding, both inside and outside.
The façades and facades of the patio have also been painted.
Likewise, work is being done at the main entrance of the building, where the wooden railing of the main staircase is being restored and several pieces of marble are being restored.
The works will prevent this weekend from opening the building for tourist visits.
Source: Ayuntamiento de Jumilla