A street of the Fourth District, located between Cura Abellán and Diego Abellán will soon be renewed all its infrastructures.
Drinking water and sewerage networks will be replaced by new PVC networks.
Likewise, the current pavement, still of cement, will be eliminated by a concrete slab with a surface treatment with a scratched finish.
It is a street that is quite deteriorated with subsidence of the land that produce potholes and puddles with danger for neighbors.
The works will be carried out by the company Ayllonza for a cost of 22,272.52 euros and a deadline of one month.
Source: Ayuntamiento de Jumilla