Portal de Jumilla

www.portaldejumilla.com

Jumilla - SpanishJumilla - English
detail of Jumilla

 

The council is executing works in schools teaching the municipality (09/07/2014)

After completing the classes at Education Centers and Primary Jumilla, the departments of Education and Services have initiated an action plan in a local primary school, focusing on remodeling and maintenance items, such as paint , masonry, carpentry and plumbing, which will be developed throughout the summer.

For such actions has increased the municipal staff with hiring a carpenter and a painter, which allows executing these activities during the summer.

The work began a few weeks ago in the CEIP San Francisco, where they have removed the stairs of the main entrance to school child, and has conditioned the entry ramp, thus eliminating existing architectural barriers.

There will also proceed to fenced reservoir that supplies heating oil to infant classrooms, is expected to end with performances remodeling of the exterior lighting of the center as well as the adequacy of child playground.

Simultaneously, in the CIS Prince Philip has proceeded to paint the building entrance for children, as well as the entrance, hallways and stairs of the main building.

Once the paint jobs are completed in the center, begin with such action in the CEIP Carmen Conde, where also various paint jobs will be made at the entrances and corridors.

Moreover, in the CEIP Mariano Suárez have undertaken reforms in terms of carpentry and glassware, especially focused on the replacement of existing assets by safety glass.

We have also done work in the design of classroom doors child, and will proceed to paint classrooms upstairs.

The CEIP Miguel Hernández, they are replacing a total of fifteen windows on the top floor, with more than 30 years, insulated windows, in order to optimize energy resources for heating in the building.

Also will be making various plumbing work, and is expected to head the flag is repaired.

Finally, in the CEIP Our Lady of the Assumption, is expected to access the stairs infant classrooms are replaced by a ramp to facilitate transit.

In the yard is to install a font, it will add to performance work as baseboards, tiles, and disposal of holes alcorques records linked with, among other actions.

The Councillor for Education, Alicia Abellan, and Services, Juan Manuel Abellan, visited these days, some of the works being carried out in these schools, where visits have also taken advantage of, to collect petitions of school principals have transmitted them over the next municipal budgets.

As highlighted Juan Manuel Abellan, "this is an important plan of action in public education centers of the municipality, much needed given the age of the building, which slowly from the departments involved are being given response" .

Meanwhile Alicia Abellan, Councillor for Education, stressed that "while the powers in public school buildings are in the Community, the City of Jumilla is making a major effort to adapt the premises of public schools, in performances."

Source: Ayuntamiento de Jumilla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información